FINAL EIS
UDOT released the Final EIS on Aug. 31, 2022 and identified Gondola Alternative B as the preferred alternative to improve transportation in the canyon. Gondola B best meets the project purpose and need and provides the highest travel reliability for the public. A 45-day public review and comment period was open Sept. 2 to Oct. 17, 2022.
UDOT released two supplementary information reports for inventoried roadless area impacts and updated air quality modeling on March 17, 2023 and a public review and comment period was open from March 19 to April 18, 2023.
FINAL EIS Supplemental Information
Supplemental Information Report - Assessment of the Roadless Area Conservation Rule for the Final EIS Alternatives
Air Quality Supplemental Information Technical Report
Air Quality Modeling and Software Data
**This file contains air quality modeling and software data.
Recognizing that safety, mobility and reliability are issues on S.R. 210 today, and that it may take years to secure federal, state and/or private funding for full implementation of Gondola Alternative B, UDOT proposed a phased implementation plan starting with components of the Enhanced Bus Service.
The proposed phasing would include increased and improved bus service as described in the Enhanced Bus Service Alternative (with no canyon roadway widening), tolling or restrictions on single occupancy vehicles, and the construction of mobility hubs. UDOT would also proceed with widening and other improvements to Wasatch Boulevard, constructing snow sheds, and implementing trailhead and roadside parking improvements, as funding allows.
These improvements will improve air quality, protect the watershed, and increase the quality of life for residents and canyon users by reducing traffic congestion as private vehicles shift to transit.
FINAL EIS Materials
Final EIS Preferred Alternatives Video: Part 1 - Aug. 31, 2022
Final EIS Preferred Alternatives Video: Part 2 - Aug. 31, 2022
LCC EIS National Environmental Policy Act Process Video
Final EIS Fact Sheets
Summary of Revisions to Alternatives
Final EIS Documents
LCC FEIS Volume 1
LCC FEIS Volume 1 (PDF, 149 MB)
LCC FEIS Cover & Table of Contents – V1
LCC FEIS Coversheet
LCC FEIS Chapter S – Summary
LCC FEIS Chapter 1 – Purpose & Need
LCC FEIS Chapter 2 – Alternatives
LCC FEIS Chapter 2A – Screening Report
LCC FEIS Chapter 2B – Imbalanced Lane Plans
LCC FEIS Chapter 2C – Five Lane Plans
LCC FEIS Chapter 2D – Enhanced Bus PPSL Plans
LCC FEIS Chapter 2E – Gondola Plans
LCC FEIS Chapter 2F – Cog Rail Plans
LCC FEIS Chapter 2G – Preferred Alternatives Technical Memo
LCC FEIS Chapter 2H – Base Station and Bus Stop Modifications from Draft EIS
LCC FEIS Chapter 2I – Phased Implementation of Preferred Alternative
LCC FEIS Volume 2
LCC FEIS Volume 2 (PDF, 35 MB)
LCC FEIS Cover & Table of Contents – V2
LCC FEIS Chapter 3 – Land Use
LCC FEIS Chapter 4 – Community
LCC FEIS Chapter 4A – Property Impacts
LCC FEIS Chapter 5 – Environmental Justice
LCC FEIS Chapter 6 – Economics
LCC FEIS Chapter 7 – Traffic & Transportation
LCC FEIS Chapter 8 – Joint Development
LCC FEIS Chapter 9 – Considerations Related to Pedestrians and Bicyclists
LCC FEIS Chapter 10 – Air Quality
LCC FEIS Chapter 10A – Air Quality Technical Report
LCC FEIS Volume 4
LCC FEIS Volume 4 (PDF, 126 MB)
LCC FEIS Cover & Table of Contents – V4
LCC FEIS Chapter 12 – Water Resources
LCC FEIS Chapter 13 – Ecosystem Resources
LCC FEIS Chapter 13A – Pertinent Correspondence
LCC FEIS Chapter 13B – Riparian Habitat Conservation Areas Assessment Memorandum
LCC FEIS Chapter 14 – Floodplains
LCC FEIS Chapter 15 – Cultural Resources
LCC FEIS Chapter 15A – Architectural Resources
LCC FEIS Chapter 15B – Determinations of Eligibility and Findings of Effect
LCC FEIS Chapter 16 – Hazardous Materials and Waste Sites
LCC FEIS Chapter 17 – Visual Resources
LCC FEIS Chapter 17A – Key Observation Points for the Enhanced Bus Service and Gondola Alternatives
LCC FEIS Chapter 17B – Key Observation Points for the Cog Rail Alternative
LCC FEIS Chapter 18 – Energy
LCC FEIS Chapter 19 – Construction Impacts
LCC FEIS Chapter 20 – Indirect Effects
LCC FEIS Chapter 21 – Cumulative Impacts
LCC FEIS Chapter 22 – Short-term Uses versus Long-term Productivity
LCC FEIS Chapter 23 – Irreversible and Irretrievable Commitment of Resources
LCC FEIS Chapter 24 – Permits, Reviews, Clearances, and Approvals
LCC FEIS Chapter 25 – Mitigation Summary
LCC FEIS Volume 5
LCC FEIS Volume 5 (PDF, 44 MB)
LCC FEIS Cover & Table of Contents – V5
LCC FEIS Chapter 26 – Section 4(f) and Section 6(f) Evaluation
LCC FEIS Chapter 26A – USDA Forest Service Letter Regarding Section 4(f) Determination for Climbing Boulders
LCC FEIS Chapter 26B – De Minimis Correspondence
LCC FEIS Chapter 27 – Public and Agency Consultation and Coordination
LCC FEIS Chapter 27A – Public Hearing
LCC FEIS Chapter 27B – Revised Section 4(f) and Section 6(f) Evaluation Public Review Notices
LCC FEIS Chapter 28 – U.S. Department of Agriculture Forest Service Forest Plan Amendments
LCC FEIS Chapter 29 – List of Preparers
LCC FEIS Chapter 30 – Distribution
LCC FEIS Chapter 31 – Index
LCC FEIS Volume 6
LCC FEIS Volume 6 (PDF, 483 MB)
LCC FEIS Cover & Table of Contents – V6
LCC FEIS Chapter 32 – Response to Comments
LCC FEIS Chapter 32A – Commenter Matrix
LCC FEIS Chapter 32B DEIS Comments 1-3086
LCC FEIS Chapter 32B DEIS Comments 3087-5890
LCC FEIS Chapter 32B DEIS Comments 5891-8834
LCC FEIS Chapter 32B DEIS Comments 8835-11677
LCC FEIS Chapter 32B DEIS Comments 11678-13307
LCC FEIS Chapter 32B DEIS Comments 13308-13321
LCC FEIS Chapter 32B DEIS Comments 13322-13335
LCC FEIS Chapter 32B DEIS Comments 13336-13443
LCC FEIS Chapter 32C – Chapter 32B DEIS Section 4(f) Comments 1-866
LCC FEIS Chapter 32D – Constructive Use Memo
LCC FEIS Chapter 32E – Tower Simulations
Final EIS Comments
UDOT made the public comments received during the Final EIS comment period available for public review on November 7, 2022. The project team is currently doing a comprehensive review of all comments received on the Final EIS, but has not completed this review process.